So here is the half finished product. There will be another part above the fridge but he had to rebuild it as it no longer fit since the cabinet was lowered 4", besides that he made it 1/2" too wide. Note that he did also install the panel on the side of the lower by the sink. He was supposed to come back Monday, but he didn't say which Monday so I guess it wasn't this one. In his defense he did have his transmission blow up and was left with one forward gear. He did make 2 trips that way (and probably p'oed off everyone else on the road)
Monday, December 6, 2010
Uppers Going In at Last
So here is the half finished product. There will be another part above the fridge but he had to rebuild it as it no longer fit since the cabinet was lowered 4", besides that he made it 1/2" too wide. Note that he did also install the panel on the side of the lower by the sink. He was supposed to come back Monday, but he didn't say which Monday so I guess it wasn't this one. In his defense he did have his transmission blow up and was left with one forward gear. He did make 2 trips that way (and probably p'oed off everyone else on the road)
Subscribe to:
Post Comments (Atom)
1 comment:
Beautiful cabinets. I can't believe he only put in one shelf - obviously he only makes cabinets and does not do any work in the kitchen.
Post a Comment