
Yahoo! windows on the back patio. These are not finished as the tops have yet to be installed, but none the less, they are windows and I am thrilled to have them in place. The arch has to be cut and bent and installed in place so here they are with the bending machine. Because the window openings are all concrete each one is different and so they cannot be mass produced. Each one is measured carefully and custom made.


Here is one of the windows at the front. This one is pretty good but I think that it will have to come out as there is a problem with symmetry.

This is another of the windows at the front and they are just taking the glass out again, in fact they took the whole window out again. In the picture below you can see the problem with the
symmetry. What happened is that in the picture on the bottom you can see a pillar the edge of on the far right (see the grey topper). Well that pillar was installed with the arches same as at the back. Then they realized that they needed space for the light switches, so they added about a foot of concrete beside it. When they did that the arch got changed and it ended up being out of symmetry. It was not noticable until they went to install the window and then wow, was it ever noticable. It is not so noticable on the window on the right but both have problems and now that I know it is there it is really obvious to me. Anyhow it was going to forever bug me (and Abigale) so the window came out and Abigale will fix it.
1 comment:
Have fun with the windex!! (lol) - I am seeing my brother and his wife tonight (he is treating for dinner - yeah no SUBWAY!!) Then I am off to Brandon, MB on Sunday. Will have to add another measle spot to your map. Have a good weekend. Love LJ
Post a Comment